Recommendations and Key Correspondence Archive

#   Title of Recommendation   Date
130   Engineering Test Reactor Engineering Evaluation / Cost Analysis   11/21/2006
129   Operable Unit 3-14 (Tank Farm Soils) Proposed Plan   09/20/2006
128   Public Involvement of Document Submittals for Decontamination and Decommissioning of Nuclear Reactors   03/22/2006
127   Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Closure and Sodium-Bearing Waste Treatment Facility   03/22/2006
126   Radioactive Waste Management Complex (RWMC) Stakeholder Involvement Activity   05/16/2006
125   Steam Reforming Treatment for the Liquid Sodium-Bearing Waste   09/20/2005
124   Options for Disposition of Buried Waste from the Idaho Site   07/20/2005
123   Disposition of Calcined High-Level Waste from the Idaho Site   07/20/2005
122   Overall Approach to Cleanup and Closure of the Idaho Nuclear Technology and Engineering Center   05/18/2005
121   Overall Approach to Cleanup and Closure of the Subsurface Disposal Area   05/18/2005
120   Engineering Evaluation/Cost Analysis for Phase 1 of the Decommissioning for the Power Burst Facility Reactor Building   01/19/2005
119   Cleanup and Closure of the Radioactive Waste Management Complex   01/19/2005
118   Alternatives to Incineration Project Plan   01/19/2005
117   Disposition for Orphan Wastes at the Idaho National Engineering and Environmental Laboratory   11/17/2004
116   Draft Engineering Evaluation and Cost Analysis for the CPP-603A Basin   09/22/2004
115   Scoping Comments for the Fast Flux Test Facility Decommissioning Environmental Impact Statement   09/22/2004
114   The Idaho National Engineering and Environmental Laboratory Citizens Advisory Board’s End State Vision   09/22/2004
113   Environmental Management Budget   03/23/2004
112   Modification to the Hazardous Waste Facility Permit for the Waste Isolation Pilot Plant   03/23/2004
111   Draft Request for Proposal for the Idaho Cleanup Project and Draft Request for Proposal for Idaho National Laboratory   03/03/2004
110   Public Involvement in the Development of the Draft Idaho National Engineering and Environmental Laboratory Risk-Based End State Vision Document   01/21/2004
109   Draft Idaho National Engineering and Environmental Laboratory Risk-Based End State Vision   01/21/2004
108   Implementing Direct Department of Energy Relationships and Funding to Site Specific Advisory Boards   11/19/2003
107   Final Environmental Assessment for the Idaho National Engineering and Environmental Laboratory Sagebrush Steppe Ecosystem Reserve Management Plan   09/17/2003
106   Long-Term Stewardship Implementation Plan for the Idaho National Engineering and Environmental Laboratory   07/16/2003
105   End State Vision for the Idaho National Engineering and Environmental Laboratory   07/16/2003
104   Community Relations Plan   07/16/2003
103   Cleanup Driven by Risk-Based End States   01/22/2003
102   Disposition of V-Tank Contents   01/22/2003
101   Site Transition Framework for Long-Term Stewardship   11/20/2002
100   Final Idaho High-Level Waste and Facilities Disposition Environmental Impact Statement   11/20/2002
99   Draft Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment   09/18/2002
98   Draft Environmental Management Performance Management Plan for Accelerating Cleanup of the Idaho National Engineering and Environmental Laboratory   06/13/2002
97   Stakeholder Involvement Plan for the Idaho National Engineering and Environmental Laboratory Water Integration Project   03/20/2002
96   Draft U.S. Department of Energy Idaho Operations Office Strategic Plan   03/20/2002
95   Science and Technology Budget for the Fiscal Year 2003   03/20/2002
94   Public Involvement to Support Priority Setting for the Expedited Cleanup Account at the Idaho National Engineering and Environmental Laboratory   03/20/2002
93   Idaho National Engineering and Environmental Laboratory Long-Term Stewardship Vision, Mission, Goals, and Objectives   03/20/2002
92   Proposed Plan for Operable Unit 10-04: Waste Area Groups 6 and 10   03/20/2002
91   Community Forum to Discuss the Future of the Idaho National Engineering and Environmental Laboratory   03/20/2002
90   Implementation of the Department of Energy Long-Term Stewardship Strategic Plan at the INL   01/16/2002
89   Implementation of the Department of Energy Long-Term Stewardship Strategic Plan   01/16/2002
88   Draft Department of Energy Long-Term Stewardship Strategic Plan   01/16/2002
87   Stakeholder Forum on Alternative Technologies to Incineration   11/14/2001
86   Draft Environmental Impact Statement for the Proposed Relocation of Technical Area 18 Capabilities and materials at the Los Alamos National Laboratory   10/01/2001
85   Yucca Mountain Preliminary Site Suitability Evaluation   09/19/2001
84   Deactivation, Decommissioning, and Dismantlement of CPP-603 Basin Project   09/19/2001
83   Wildlife Management Plan Environmental Assessment   03/21/2001
82   Idaho National Engineering and Environmental Laboratory Institutional Plan, Fiscal Years 2001-2005   02/21/2001
81   Idaho Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure Plan for Idaho Nuclear Technology and Engineering Center Tanks WM-182 and WM-183   01/24/2001
80   Proposed Plan for Remediation of Contaminated Groundwater Plume at Test Area North   01/24/2001
79   Rehabilitation of Areas Affected by Wildfire   11/15/2000
78   Long-Term Stewardship   11/15/2000
77   Operation of the Waste Experimental Reduction Facility Incinerator   09/20/2000
76   Draft Programmatic Environmental Impact Statement for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions to the United States, Including the Role of the Fast Flux Test Facility   09/20/2000
75   Incinerator at the Waste Experimental Reduction Facility   07/19/2000
74   Environmental Impact Statement for the Proposed Relocation of the Los Alamos National Laboratory Technical Area 18 Mission   06/20/2000
73   Idaho High-Level Waste and Facilities Disposition Draft Environmental Impact Statement   03/22/2000
72   Idaho National Engineering and Environmental Laboratory Institutional Plan   03/22/2000
71   The Future of the Waste Experimental Reduction Facility at the Idaho National Engineering and Environmental Laboratory   03/22/2000
70   Accessibility of Contractor Resources to Support Citizens Advisory Board Deliberations   03/22/2000
69   Evaluation of Ecological Health at the Idaho National Engineering and Environmental Laboratory   03/22/2000
68   Stakeholder Involvement in Long-Term Stewardship Planning   03/22/2000
67   Draft Hazardous and Polychlorinated Biphenyl Waste Facility Partial-Permit for the Advanced Mixed Waste Treatment Facility   01/26/2000
66   Draft Environmental Impact Statements for a Geologic Repository for Spent Nuclear Fuel and High-Level Waste, Nye County, Nevada   01/26/2000
65   Programmatic Environmental Impact Statements for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States   11/16/1999
64   Draft Environmental Impact Statement for the Treatment and Management of Sodium-Bonded Spent Nuclear Fuel   09/15/1999
63   Standards Used to Determine the Need for Remediation of Groundwater Groundwater. Addressed to William B. Richardson, Carolyn Huntoon, Beverly Cook, Wayne Pierre, and Kathleen Trever   09/15/1999
62   Proposed Plan for Operable Unit 4-13A Interim Action, Waste Area Group (WAG 4), Central Facilities Area   09/15/1999
61   Stakeholder Statements Developed at the Site Specific Advisory Board Transportation Seminar   07/21/1999
60   Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement   07/20/1999
59   Proposed Plan for Waste Area Group 5 (WAG 5) - Power Burst Facility/Auxiliary Reactor Area   05/19/1999
58   Environmental Impact Statement for Electrometallurgical Treatment of Sodium-Bonded Spent Nuclear Fuel in the Fuel Conditioning Facility at Argonne National Laboratory - West   04/21/1999
57   Idaho National Engineering and Environmental Laboratory Citizens Advisory Board's Position of the Potential Violation of the April 30th Milestone under the Idaho Settlement Agreement   03/17/1999
56   Revised Draft Resource Conservation and Recovery Act Part B Permit for the Waste Isolation Pilot Plant (directed to the Department of Energy's Idaho Operations Office)   01/19/1999
55   Revised Draft Resource Conservation and Recovery Act Part B Permit for the Waste Isolation Pilot Plant (directed to the State of Idaho)   01/19/1999
54   Proposed Plan for Waste Area Group 1, Test Area North   01/19/1999
53   Draft Request for Proposal for Managing and Operating the Idaho National Engineering and Environmental Laboratory   12/31/1998
52   Transfer of Health Source/Radioisotope Thermoelectric Generator Assembly and Test Operations Environmental Impact Statement   11/18/1998
51   Proposed Production of Plutonium-238 for Use in Advanced Radioisotope Power Systems for Future Space Missions Environmental Impact Statement   11/18/1998
50   Proposed Plan for Remedial Action at the Idaho Chemical Processing Plant (WAG 3)   11/18/1998
49   Preliminary Draft Environmental Assessment for Intermodal Transport of Low-Level Radioactive Waste to the Nevada Test Site   11/18/1998
48   Extensions to Department of Energy Public Comments Periods   10/30/1998
47   Draft Environmental Impact Statement for the Advanced Mixed Waste Treatment Project   09/15/1998
46   Surplus Plutonium Disposition Draft Environmental Impact Statement   09/15/1998
45   Integration of Shoshone-Bannock Tribes' Perspectives Regarding Risk Assessment   07/22/1998
44   Draft Plutonium Fact Sheet   07/22/1998
43   Draft Resource Conservation Recovery Act Part B Permit for the Waste Isolation Pilot Plant   07/22/1998
42   Department of Energy's Notice of Intent to Conduct and Analysis of Policy Regarding Disposal of Low-Level and Mixed Low-Level Waste at Commercial Facilities   05/20/1998
41   Draft Accelerating Cleanup: Paths to Closure Document   04/30/1998
40   Proposed Plan for Waste Area Group 1, Test Area North   03/19/1998
39   Implementation of the Comprehensive Environmental Response, Compensation, and Liability Act at the Idaho National Engineering and Environmental Laboratory   03/19/1998
38   Fiscal Year 1999 and 2000 Budget Requests   03/19/1998
37   Idaho National Engineering and Environmental Laboratory Site Tours   01/20/1998
36   Proposed Plan for Waste Area Group 9 (Argonne National Laboratories - West)   01/20/1998
35   Proposed Plan for Waste Area Group 8 (Naval Reactors Facility)   01/20/1998
34   Proposed Soils Repository at the Idaho National Engineering and Environmental Laboratory   01/20/1998
33   Proposed Strategy for Remedial Actions at Waste Area Group 3, Idaho Chemical Processing Plant   01/20/1998
32   Explanation of Significant Different Regarding Pit 9   11/19/1997
31   Issues for Consideration in the Draft Surplus Plutonium Disposition Environmental Impact Statement   11/19/1997
30   Opening of Idaho National Engineering and Environmental Laboratory Technical Library to the General Public   11/19/1997
29   High-Level Waste and Facilities Disposition Environmental Impact Statement   11/19/1997
28   Curricula Development and Continuing Education Opportunities for Elementary and Secondary School Teachers   11/19/1997
27   Waste Area Group 3 Fact Sheet   09/17/1997
26   Low-Level Waste Management   09/17/1997
25   Mixed Low-Level Waste Management   09/17/1997
24   Department of Energy's Focus on 2006 (Discussion Draft), the Contractor Report to the DOE on the Environmental Management Baseline Programs and Integration Opportunities (Discussion Draft), and the Idaho Operations Office's Environmental Management Fiscal Year 1999 Budge Priorities Document   07/16/1997
23   Environmental Documentation Process for the Advanced Mixed Waste Treatment Project   07/16/1997
22   Use of Video Conferencing for Public Hearings   07/16/1997
21   Waste Area Group 3 Remedial Investigation/Feasibility Study   03/19/1997
20   Waste Isolation Pilot Plant Supplemental Environmental Impact Statement   03/19/1997
19   Idaho National Engineering Laboratory High-Level Waste Program   01/22/1997
18   U.S. Department of Energy Strategic Laboratory Missions Plan   01/22/1997
17   Idaho National Engineering Laboratory Low-Level Waste Program   09/18/1996
16   Idaho National Engineering Laboratory Ten-Year Plan   09/18/1996
15   Idaho National Engineering Laboratory Spent Nuclear Fuel Management Plan Document   07/16/1996
14   Environmental Management Fiscal Year 1998 Integrated Budget Prioritization   03/20/1996
13   Fiscal Year 1998 Prioritization of Environmental Management Activities   01/17/1996
12   Idaho National Engineering Laboratory Draft Comprehensive Facility and Land Use Plan   11/15/1995
11   Environmental Management Fiscal Year 1998 Integrated Budget Prioritization   11/15/1995
10   Integration of Environmental Management Activities at the Idaho National Engineering Laboratory   08/02/1995
9   Stationary Low-Power Reactor-1 and the Boiling Water Reactor Experiment I Burial Grounds (Operable Units 5-05 and 6-01) and Central Facility Area Landfills, I, II, and III (Operable Unit 4-03)   08/02/1995
8   Groundwater Contamination at Test Area North   06/21/1995
7   Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel   06/20/1995
6   U.S. Department of Energy-Owned Spent Nuclear Fuel Strategic Plan   06/20/1995
5   Long-term Land Use Future Scenarios for the Idaho National Engineering Laboratory   05/02/1995
4   Environmental Management Budget   03/22/1995
3   Department of Energy Idaho Operations Office's Fiscal Year 1995 Draft Workforce Restructuring Plan   02/08/1995
2   Idaho National Engineering Laboratory Draft Site Treatment Plan   12/07/1994
1   Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Draft Environmental Impact Statement   09/30/1994